New Mining Shovel Buckets For Sale In Indiana
10.4m (13.6)yd Coal bucket for the 6015B Hyd Mining Shovel
- Material Density
- 1685 lb/yd³
- Capacity
- 13.6 yd³
- Capacity
- 13.6 yd³
10m³ (13.1yd³) Standard Rock bucket for the 6018 Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 13.1 yd³
- Capacity
- 13.1 yd³
11m³ (14.4yd³) Heavy Rock bucket for the 6020B Hyd Mining Shovel
- Material Density
- 3371 lb/yd³
- Capacity
- 14.4 yd³
- Capacity
- 14.4 yd³
11m³ (14.4yd³) Standard Rock bucket for the 6020B Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 15.7 yd³
- Capacity
- 15.7 yd³
12m³ (15.7yd³) Standard Rock bucket for the 6030 Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 22.2 yd³
- Capacity
- 22.2 yd³
12m³ (15.7yd³) Heavy Rock bucket for the 6020B Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 15.7 yd³
- Capacity
- 15.7 yd³
12m³ (15.7yd³) Iron Ore bucket for the 6030 Hyd Mining Shovel
- Material Density
- 4382 lb/yd³
- Capacity
- 15.7 yd³
- Capacity
- 15.7 yd³
15m³ (19.6yd³) Heavy Rock bucket for the 6030 Hyd Mining Shovel
- Material Density
- 3371 lb/yd³
- Capacity
- 19.6 yd³
- Capacity
- 19.6 yd³
17m³ (22.2yd³) Standard Rock bucket for the 6040 Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 28.8 yd³
- Capacity
- 28.8 yd³
18m³ (23.5yd³) Iron Ore bucket for the 6040 Hyd Mining Shovel
- Material Density
- 3708 lb/yd³
- Capacity
- 23.5 yd³
- Capacity
- 23.5 yd³
20m³ (26.2yd³) Heavy Rock bucket for the 6040 Hyd Mining Shovel
- Material Density
- 3371 lb/yd³
- Capacity
- 26.2 yd³
- Capacity
- 26.2 yd³
25m³ (32.7yd³) Heavy Rock bucket for the 6050 Hyd Mining Shovel
- Material Density
- 3371 lb/yd³
- Capacity
- 32.7 yd³
- Capacity
- 32.7 yd³
25m³ (32.7yd³) Iron Ore bucket for the 6060 Hyd Mining Shovel
- Material Density
- 4045 lb/yd³
- Capacity
- 32.7 yd³
- Capacity
- 32.7 yd³
28m³ (36.6yd³) Heavy Rock bucket for the 6060 Hyd Mining Shovel
- Material Density
- 3708 lb/yd³
- Capacity
- 36.6 yd³
- Capacity
- 36.6 yd³
34m³ (44.5yd³) Standard Rock bucket for the 6060 Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 44.5 yd³
- Capacity
- 44.5 yd³
4.6m³ (6.0yd³) Heavy Rock Bucket for the 6015 Hyd Mining Shovel
- Material Density
- 4045 lb/yd³
- Capacity
- 6.0 yd³
- Capacity
- 6 yd³
4.6m³ (6.0yd³) Heavy Rock Bucket for the 6015 Hyd Mining Shovel
- Material Density
- 4045 lb/yd³
- Capacity
- 9.8 yd³
- Capacity
- 9.8 yd³
4.6m³ (6.0yd³) Heavy Rock bucket for the 6015 Mass Excavation Hyd Mining Shovel
- Material Density
- 5056 lb/yd³
- Capacity
- 6.0 yd³
- Capacity
- 6 yd³
5.8m (7.6)yd Extreme Duty bucket for the 6015B Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 7.6 yd³
- Capacity
- 7.6 yd³
6.6m (8.6)yd Heavy Duty bucket for the 6015B Hyd Mining Shovel
- Material Density
- 3033.9 lb/yd³
- Capacity
- 8.6 yd³
- Capacity
- 8.6 yd³
6m³ (7.8yd³) Heavy Rock bucket for the 6015 Mass Excavation Hyd Mining Shovel
- Material Density
- 3708 lb/yd³
- Capacity
- 7.8 yd³
- Capacity
- 7.8 yd³
6m³ (7.8yd³) Standard Rock bucket for the 6015 Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 7.8 yd³
- Capacity
- 7.8 yd³
7.4m (9.7)yd Extreme Duty bucket for the 6015B Hyd Mining Shovel
- Material Density
- 3034 lb/yd³
- Capacity
- 9.7 yd³
- Capacity
- 9.7 yd³
7.4m (9.7)yd General Duty bucket for the 6015B Hyd Mining Shovel
- Material Density
- 2949.6 lb/yd³
- Capacity
- 9.7 yd³
- Capacity
- 9.7 yd³
7m (9.2yd) Standard Rock bucket for the 6015 Hyd Mining Shovel
- Material Density
- 2360 lb/yd³
- Capacity
- 9.2 yd³
- Capacity
- 9.2 yd³